![](https://ca-v2.s3-ap-southeast-2.amazonaws.com/snowy20/SH1249_Snowy 2_0 Cross-section Feb_2019.jpg?v=2.0)
Project Alignment
Approximately 27 kilometres of power waterway tunnels will link Tantangara and Talbingo dams through the Snowy 2.0 underground power station. Most of this infrastructure will be underground, with access to the surface provided via several tunnels and portals.