Videos
Images
Documents
File | Size | |
---|---|---|
February 2022
Design Jury report - Design Report |
8.96 MB | |
22 November 2021
Aspect Studios - Design Report |
65.94 MB | |
22 November 2021
REALMstudios - Design Report |
54.52 MB | |
22 November 2021
Civille - Design Report |
37.13 MB |
File | Size | |
---|---|---|
1 April 2022
Announcement media release |
327.63 KB | |
16 August 2021
Design Sydney Harbour Bridge's new bike ramp |
57.6 KB |
File | Size | |
---|---|---|
Alfred Street Cycle Path Overview | 1.61 MB | |
Aboriginal Design Principles | 9.88 MB | |
Detailed Heritage Framework - Draft | 39.1 MB |
File | Size | |
---|---|---|
April 2022 - Outcomes report | 2.4 MB | |
March 2022 - Response to Bradfield Park Central proposal | 319 KB | |
March 2022 - Bradfield Park Central - Arcadis technical review | 501 KB | |
March 2022 - Response to community questions | 1.01 MB | |
August 2021 - Community Consultation Report | 6.06 MB | |
June 2021 - FAQs | 2.2 MB | |
June 2021 project overview | 2.79 MB | |
June 2021 community update
Northern access project. |
1.09 MB |
File | Size | |
---|---|---|
November 2017 community update
Cycleway Access Proposals. |
483 KB | |
November 2017 options report
Sydney Harbour Bridge Northern Cycle Ramp |
50.4 MB | |
November 2017 options report
Appendix A – Site Constraints. |
19.1 MB | |
November 2017 options report
Appendix B – Preliminary Strategic Options. |
7.9 MB | |
November 2017 options report
Appendix C – Case studies for outdoor elevators/escalators. |
74.5 KB | |
November 2017 options report
Appendix D – Cycle ramp options feasibility study – 2012. |
20.9 MB | |
March 1999 Feasibilty Study | 18.8 MB | |
November 2017 review of environmental factors report
Sydney Harbour Bridge Southern Cycleway. |
16.4 MB | |
November 2017 review of environmental factors report
Appendix A - Urban design, landscape and visual impact assessment. |
7.98 MB | |
November 2017 review of environmental factors report
Appendix B - Consideration of clause 228(2) factors and matters of national environmental significance |
43.2 KB | |
November 2017 review of environmental factors report
Appendix C - Statutory consultation checklists. |
43.9 KB | |
November 2017 review of environmental factors report
Appendix D - Non-Aboriginal heritage assessment. |
12.7 MB | |
November 2017 review of environmental factors report
Appendix E – Noise and vibration impact assessment. |
5.82 MB | |
November 2017 review of environmental factors report
Appendix F – Traffic and transport assessment. |
5.35 MB | |
November 2017 review of environmental factors report
Appendix G – Socio-economic impact assessment. |
4.81 MB | |
November 2017 review of environmental factors report
Appendix H - Biodiversity impact assessment. |
4.56 MB | |
November 2017 review of environmental factors report
Appendix I – Arboricultural impact assessment. |
5.11 MB | |
November 2017 review of environmental factors report
Appendix J - Preliminary site investigation. |
37.4 MB | |
November 2017 review of environmental factors report
Appendix K – AHIMS search result. |
315 KB | |
November 2017 review of environmental factors report
Appendix L - Preliminary options testing. |
5.94 MB |
View towards Milsons Point Station – before and after (Aspect Studios)
Aerial view: Before/After (Aspect Studios)
Events
Meet the project team
Pop up event
- Date: Wednedsay, 12 January 2022
- Times: 4:30PM - 6:00PM
- Address: Foot of the Northern Steps, Milsons Point, NSW 2061
Livestreams
You can use Chrome, Edge or Firefox for the video, however Safari is not supported.
Sydney Harbour Bridge Northern Cycleway ramp design survey
Provide feedback on the three ramp concept designs. Feedback closes at midnight on Sunday 16 January 2022. Responses will be analysed and presented to the Design Jury for consideration along with their own assessment of the three designs. We will only be including responses to the feedback form in our report to the Design Jury.
If you prefer to complete a hard copy of the questionnaire, please print off this PDF and either email or scan to sydneyharbourbridgeprojects
Sydney Harbour Bridge Cycleway
Northern Access Project
Locked Bag 928
North Sydney NSW 2059
If you would like help in completing the form, please contact us on 1800 581 595 or at sydneyharbour