About the additional Grafton Bridge
The NSW Government is funding this project which involves building an additional bridge 70 metres downstream from the existing road and rail bridge. The project will also include upgrading parts of the road network in Grafton and South Grafton to connect the new bridge to the existing road network.
Flood animation video
Developing the new flood model
360º driver view video
Driver Views
Construction animation video
Technical flood simulation videos
Click on a project icon from the image to get started.
$show_flood_toggles = 0;
if ( $show_flood_toggles == 1 ) : ?>
endif; ?>
Watch aerial view animation
Watch driver view (south over bridge)
Watch cyclist view (north over bridge)
Watch driver view (Greaves Street)
Developing the new flood model
Construction staging
360º driver view (south to north)
Artist impression (with flood simulation)
from northern riverbank
from northern riverbank
Artist impression (with flood simulation)
from north-west riverbank
from north-west riverbank
Artist impression (with flood simulation)
from south-west riverbank
from south-west riverbank
Artist impression looking from
existing bridge to new bridge
existing bridge to new bridge
Artist impression looking from
new bridge to existing bridge
new bridge to existing bridge
Artist impression from
north-east riverbank
north-east riverbank