Indicative only, final layout to be determined through detailed
design
Map key
Reset
-
Western Harbour Tunnel - tunnel
-
Western Harbour Tunnel - surface
-
Warringah Freeway Upgrade
-
Beaches Link - tunnel
-
Beaches Link - surface
- Construction
-
Construction site footprints
-
Construction haulage inbound
-
Construction haulage outbound
- Air quality
-
Reduction of 1 - 2 micrograms per cubic metre
-
Reduction of 0.8 - 1 micrograms per cubic metre
-
Increase of 0.2 - 0.8 micrograms per cubic metre
-
Increase of 0.8 - 1.8 micrograms per cubic metre
- Noise and vibration
-
40 dBA
-
45 dBA
-
50 dBA
-
55 dBA
-
60 dBA
-
65 dBA
-
70 dBA
-
75 dBA
-
Map layers – Surburbs
Map layers – Construction
Map layers – Air quality (PM2.5) change
Map layers – Construction noise
Note: Our noise assessments are conservative and always assess the worst case scenario. We often find when we are working, the noise generated is less than we predicted.