Insecure browser/WebGL disabled:
There are security and user experience issues with your current browser. A secure modern browser with WebGL enabled is required to display interactive maps and other features.
Construction notifications map archive
Please find details below of previous construction notifications for the Warringah Freeway Upgrade. If you have any questions about our work you can contact the team on 1800 931 189 or whtbl@transport.nsw.gov.au.
Explore our interactive map to see the project alignment and key information about the proposed design and construction of the project.
Please note: This interactive map contains information from the Western Harbour Tunnel and Warringah Freeway UpgradeEnvironmental Impact Statement (EIS)which was published in January 2020. Since then, our design and planning for Warringah Freeway Upgrade has continued to progress, including the release of the Submissions Report in September 2020, project approval in January 2021,start of early works activities in March 2021 and the award of the design and construction contract to CPB Contractors and Downer EDIWorks in a joint venture.
For the latest project information, please visit the documents section of our portal or contact our team.
Welcome to the Warringah Freeway Upgrade Construction Notifications map
This map displays the current construction activities for the project, and is constantly updated.
Select a hotspot from the map or the left sidebar to review the notification. You can also download the notification and add the work time to your calendar.
Please revisit or bookmark this page for the latest information, sign up for project notifications here.
This dedicated interactive portal contains the latest information, maps and videos about the Warringah Freeway Upgrade project.
If you are looking for information about the Beaches Link and Gore Hill Freeway Connection or Western Harbour Tunnel, please visit the dedicated project portals:
If you have any complaints or enquiries, please contact us.
At-property noise treatment
We understand noise can be a source of disruption to local communities during the construction and operation of major road projects. To minimise the impact of our project on local residents, we are delivering at-property noise treatment to eligible properties. Noise treatment refers to architectural acoustic measures which aim to improve the sound resistance of properties, such as window and door upgrades.
We have developed a Noise Insulation Program which outlines the criteria and process for delivering noise treatment to affected properties as part of the project.
Providing at-property treatment is a complex process and involves a number of different steps. To learn more, see our fact sheet.
We are starting the process of delivering noise treatment before the project is approved so residents benefit from reduced noise as early as possible.
Missing fields:
Some required fields are missing. Please check your form.
Thank you for submitting your feedback and subscription form. You are now in our stakeholder database and will be informed of the project updates if you have selected to subscribe.
Any feedback you have provided will be considered in our next steps.
All enquiries will be responded to within five working days.
We are happy to coordinate virtual tutorials to explain the tools and techniques of the model as required.
Please raise a question in the RFT Data Room should you require any additional support.
Warringah Freeway Upgrade - Contact us
Submission received
Thank you for your submission.
Share this
Thank you for using the Warringah Freeway Upgrade interactive portal. We invite you to share this information with your friends, family and colleagues via social media or email.
The EIS assesses the potential environmental and social impacts of the Warringah Freeway Upgrade during construction and operation. The EIS also includes strategies to avoid, mitigate and manage the potential impacts of the project.
In the EIS, we cover topics such as traffic and transport, air quality, noise and vibration, construction and biodiversity impacts.
The NSW Department of Planning, Industry and Environment (DPIE) placed the EIS on exhibition from 29 January to 30 March 2020. This closing date was extended from 12 March following feedback from the community. During this time everyone had the opportunity to make submissions on the project. We are now working on a submissions report to respond to the issues raised. This report will be made public. All submissions made to DPIE are available on their website.
Create a user account by clicking the ‘Sign In’ icon in the top right of the homepage or under the ‘Services’ tab and then click the ‘Have Your Say’ link
When you are logged in, find the Warringah Freeway Upgrade project, and click the ‘Make a Submission’ icon.
How to make a hard copy submission:
You can submit a hard copy of your submission. If you want DPIE to delete your personal information before publication, please make this clear at the top of your letter. You need to include:
your name and address, at the top of the letter only
the name of the application and application number: SSI_8863
a statement on whether you support or object to the proposal
the reasons why you support or object to the proposal
a declaration of any reportable political donations made in the previous two years.
You can hand deliver your submission to DPIE’s office, located at:
4 Parramatta Square, 12 Darcy Street
Parramatta NSW 2150
You can post your submission to:
Attention: Director, Transport Assessments
Planning & Assessment, Department of Planning
Industry and Environment
Locked Bag 5022
Parramatta NSW 2124
Submissions must be received by DPIE before midnight 30 March 2020.
Filter the EIS
Select the topics you are interested in reading about
Transport for NSW (“we”) are collecting your personal information in connection with public consultation on the Western Harbour Tunnel, Warringah Freeway Upgrade and Beaches Link projects (“the Program”). We will retain and use this information for consultation purposes, including communications and analysis in connection with the Program.
We may share your submission or complaint with another NSW government agency where relevant having regard to the nature of the submission or complaint. Otherwise, except for anonymous information which does not identify you, we will not publish or disclose your personal information to any third parties without your consent unless authorised by law.
Providing your personal information is voluntary but if you do not provide it we may not include you on our stakeholder database and you might miss further consultation opportunities.
Your personal information will be held and managed by Transport for NSW in accordance with the Privacy and Personal Information Protection Act 1998 and you can contact us to access or correct it. Please email us at whtbl@transport.nsw.gov.au, write to us at Transport for NSW, Locked Bag 928, North Sydney NSW 2059, or call us on 1800 931 189.
Website accessibility
This statement relates to content available on the Transport for NSW Warringah Freeway Upgrade portal (https://caportal.com.au/rms/wfu). This website has been developed with the aim to be available to the widest possible audience, including those using assistive technology or accessibility features.
Ongoing monitoring and development is part of our strategy and we strive to comply with W3C's Web Content Accessibility Guidelines.At times, we publish documents and publications received from third parties. These third party documents may not adhere to the standards followed by Transport for NSW.
If you have any questions or comments about this statement or have problems accessing information or functions on this site please contact us.
Adobe PDF
This site contains information in portable document format (PDF). These files are made available so information is easy to download and is portable.
Some documents on this website may not conform with WCAG 2.0. If you encounter any problems accessing documents in PDF format please contact us.
Transport for NSW acknowledges the traditional owners and custodians of the land, and respects Elders past and present.
Information sessions
Submission received
Thank you for your interest in our upcoming sessions on the Warringah Freeway Upgrade and Western Harbour Tunnel.
Please check your email inbox for confirmation. If you do not receive an email confirming your registration, please email us at whtbl@transport.nsw.gov.au
We look forward to seeing you online.
IT issues
Submission received
Thank you for your submission.
Attend the Cammeray golf course information session
After registering, use the button below to attend your session.