Weekend work schedule
Scan & Plan - each week you can find out the latest dates for weekend work near you.
Night work takes place up to 10 nights per month in various locations along the freeway. Generally, night work takes place in locations where limited construction work can take place during the day when all freeway traffic lanes are open and being used by vehicle traffic.
Weekend work takes place from Friday night to Monday morning, and on long weekends from Thursday or Friday night to Monday or Tuesday morning. Over the weekends, we make productive use of lower traffic volumes in Sydney to set up road closures and complete as much work as we can over the weekend, expediting the overall project work schedule.
Upcoming weekend work between Ernest Street and Miller Street, Cammeray
Work for an upcoming permanent traffic change on the inner reversible lane of the freeway
This work is not expected to have a high noise impact to the community.
The inner reversible lane of the Warringah Freeway can currently be used in either direction depending on the time of day and traffic conditions. The lane currently traverses southbound for weekday peak traffic periods between approximately 5:30am to 9:30am. At all other times the lane traverses northbound.
From 5am Monday 2 June 2025, the southbound decision point for access to the reversible lanes will change permanently. Citybound motorists in the Monday to Friday AM peak traffic periods will access the reversible inner lanes approximately 500 metres south of the current decision point. The decision point on the freeway for access to the southbound reversible lanes will change from south of Miller Street bridge to south of Ernest Street bridge.
Additionally, the Falcon Street northbound on ramp will now merge directly onto the reversible lane of the freeway before merging into the northbound outer lanes. Currently this ramp merges directly onto the northbound outer lanes.
Road signage will be updated to reflect these changes and provide you with advanced notice.
Preparation work will occur on:
10pm Friday 16 May to 5am Monday 19 May 2025
10pm Friday 23 May to 5am Sunday 25 May 2025
The implementation of the permanent traffic change will occur on:
10pm Friday 30 May to 5am Monday 2 June 2025
Work will include
Setting up traffic controls
Line marking
Relocating barriers
Milling and asphalting
Concreting
Installing signage and formwork
Realigning traffic lanes and medians
Where we are working:
Temporary traffic changes during work
Date and Time | Closures | Detour advice |
---|---|---|
| Northbound inner lanes. | Use the northbound outer lanes. |
| Falcon Street northbound on ramp. | Use the Pacific Highway for northbound travel. |
| Southbound inner lanes closed between Miller Street and Ernest Street. | If travelling from Gore Hill Freeway, Willoughby Road or Brook Street on ramps, use the southbound outer lanes to access the Eastern Distributor via Cahill Expressway. |
Miller Street southbound on ramp, Cammeray:
Over two weekends in May 2025, we will be carrying out day and night-work work along the Warringah Freeway in Cammeray. These include:
6pm Friday 16 May to 6am Monday 19 May 2025
6pm Friday 23 May to 6am Monday 26 May 2025
We will be completing paving work in preparation for the opening of the new Miller Street southbound on ramp. This work is weather dependent and is subject to change. The work includes:
setting up traffic controls
delivering materials
wall using a crane
concreting, asphalting and compacting road surfaces
line marking and line marking removal
installing signage and safety barriers
Temporary pedestrian changes
For the safety of pedestrians and workers, weekend work on the Miller Street southbound on ramp will require the temporary closure of the eastern footpath on Miller Street between Amherst Street and Rosalind Street. A detour for pedestrians and cyclists will be in place from:
10am Friday 16 May to 6am Monday 19 May
10am Friday 23 May to 6am Monday 26 May 2025
Changed traffic conditions
The Miller Street southbound on ramp will be closed for weekend work activities from:
10am Friday 16 May to 6am Monday 19 May 2025
10am Friday 23 May to 6am Monday 26 May 2025
May 2025 - Miller Street pedestrian closure and detour
May 2025 - Miller Street southbound on ramp closure and detour
South Project Areas
Between Bradfield Highway, Milsons Point and Falcon Street, North Sydney:
May 2025 - Weekend work activities
May 2025 - Weekend work map
May 2025 - Weekend work traffic changes
May 2025 - Weekend work calendar
In May 2025, we will be continuing consecutive weekend day and night work along the freeway and intersections in North Sydney and Neutral Bay, to speed up the work programme and reduce our overall impact to the surrounding community.
We will be carrying out weekend work in the southern precinct on the following dates:
10pm Friday 16 May to 5am Monday 19 May 2025
10pm Friday 23 May to 5am Sunday 25 May 2025
For more information about the May 2025 weekend work please click here to view the 'May 2025 upcoming weekend work and temporary traffic changes, North Sydney & Neutral Bay' community notification (MW340S)'.
May 2025 work areas and work activities
Location | Work activities | Closure Times |
---|---|---|
Miller Street and Falcon Street intersection | Excavation, concrete installation for retaining wall, trenching, and utility installation work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway northbound lanes, between Ridge Street and Falcon Street | Excavation, hammering, trenching, drainage installation, concrete installation, pavement installation, and asphalting work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway northbound lanes, between Lavender Street and Ridge Street | Excavation, hammering, trenching, drainage installation, concrete installation, pavement installation, asphalting work, barrier removal and installation, and linemarking removal and installation work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway southbound lanes, between Ridge Street and Berry Street | Pavement investigation, concrete barrier and steel barrier installation and removal, saw cutting, existing barrier removal, kerb removal, excavation, temporary pavement installation, streetlight removal, and asphalt installation work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway southbound lanes, between Ridge Street and Kurraba Road | Excavation, saw cutting, trenching, drainage installation, concrete installation, pavement installation, asphalting work, barrier removal and installation, backfilling, and linemarking removal and installation work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway southbound lanes, between Berry Street and Mount Street | Concrete barrier installation and removal, saw cutting, hammering, excavation, removing hammered materials from site, drainage pits and pipes installation, asphalt installation, and gate construction work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Alfred Street North retaining wall and Warringah Freeway southbound lanes between Darley Street and Mount Street | Stormwater drainage and pavement installation work | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Mount Street underpass, and Mount Street eastern ramp | Surveying, excavation and demolition of retaining walls, pavement installation, hammering, sawcutting, backfilling, concrete installation, asphalting, Intelligent Transport Systems (ITS) installation, barrier installation and drainage installation work | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Whaling Road and Alfred Street North, between Mount Street and High Street | Existing pavement removal, new pavement installation, kerb and gutter installation, footpath and ramp installation, asphalting work, line marking installation and temporary parking removal | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Warringah Freeway northbound lane, between High Street and Mount Street | Asphalt installation work | 10pm Friday 16 May to 5am Monday 19 May 2025 |
High Street and Arthur Street intersection | Pavement installation work including excavation, hammering, concrete installation, asphalt installation, existing linemarking removal and new linemarking installation | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Pacific Highway and Warringah Freeway northbound lanes, between Lavender Street and High Street | Excavation, saw cutting, trenching, drainage installation, concrete installation, pavement installation, asphalting work, Intelligent Transport Systems (ITS) installation, barrier removal and installation and linemarking removal and installation work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway southbound lanes between High Street and Lavender Street | Barrier slipforming work | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
Warringah Freeway southbound lanes between Mount Street and High Street | Drainage installation work, hammering saw cutting, excavation, backfilling, surveying, and concrete installation | 10pm Friday 16 May
to 5am Monday 19
May 2025 10pm Friday 23 May to 5am Sunday 25 May 2025 |
May 2025 temporary traffic changes
Location | Closure Times |
---|---|
Mount Street eastern on ramp closed | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Arthur Street northbound slip lane closed | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Pacific Highway to Arthur Street slip lane closed | 10pm Friday 16 May to 5am Monday 19 May 2025 |
Berry Street northbound on ramp closed | 10pm Friday 16 May to 4:30am Saturday 17 May 2025 10pm Saturday 17 May to 4:30am Sunday 18 May 2025 10pm Sunday 18 May to 5am Monday 19 May 2025 10pm Friday 23 May to 4:30am Saturday 24 May 2025 10pm Saturday 24 May to 5am Sunday 25 May 2025 |
Military Road northbound off ramp | 10pm Friday 16 May to 4:30am Saturday 17 May 2025 10pm Saturday 17 May to 4:30am Sunday 18 May 2025 10pm Sunday 18 May to 5am Monday 19 May 2025 10pm Friday 23 May to 4:30am Saturday 24 May 2025 10pm Saturday 24 May to 5am Sunday 25 May 2025 |
Long-term road closures
Location | Closure Times |
---|---|
Alfred Street southbound off ramp to Neutral Bay, North Sydney and Kirribilli closed, Alfred Street North closed between Kurraba Road and Mount Street closed | Long-term closure from 10pm Friday 22 November to mid-2025 |
Mount Street bridge to Alfred Street North, North Sydney closed | Long-term closure from 10pm Friday 13 October to mid-2025 |
For more detailed work information, please view the 'Work activities map' and select the relevant work area using the bar on the left of the page.
Find out more about why we work over weekends in our weekend work fact sheet here.
*Please note, work dates are subject to change due to wet weather or other unforeseen events. As soon as new information becomes available, we will update the above information so it's important to check back each week for updates.