Following your feedback to the EIS, changes have been made to traffic and access around President Avenue to improve traffic flow with less stopping and starting.
Following your feedback to the EIS, changes have been made to traffic and access around President Avenue to improve traffic flow with less stopping and starting. They are:
The Arncliffe Motorways Operations Complex has been constructed as part of the M8 project. A substation, water treatment facility and mechanical fit out of the ventilation facility will be used as part of the M6 Stage 1 project.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
The ventilation outlet was constructed as part of the M8 motorway project and will be use as part of the M6 Stage 1. Elevated ventilation outlets are very effective at ejecting tunnel air high into the atmosphere through a combination of buoyancy and speed.
Once in the atmosphere, the ejected tunnel air dilutes rapidly as it mixes with the surrounding air and becomes indistinguishable from background levels.
Air quality will be continuously monitored at the ventilation outlet to control the ventilation system. This ensures the strict limits outlined in the approval conditions are complied with at all times. Once operating, air quality monitoring data will be publicly available on the new motorway website.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
The M6 tunnels are excavated using roadheader machines and a combination of drilling and blasting methods to help reduce the duration of the excavation process.
Placeholder – TBC The tunnels will be built for three lanes but initially marked for two.
Placeholder – TBC The tunnels will be built for three lanes but initially marked for two.
As the tunnels pass under Rockdale Bicentennial Park they will rise from 25 metres deep to 10 metres under the surface. This section will be constructed as a ‘cut and cover’ structure, meaning that a deep trench will be dug for the tunnels, which will be completely covered when construction is finished. The land will be returned to parkland and open space for community use
The twin tunnels will include entry and exit ramps on President Avenue.
The areas around the tunnel portal entry and exit ramps will be planted with vegetation to reflect nearby wetlands.
Treats runoff from the tunnel portal and water sensitive urban design discharges it into existing waterways.
New cul-de-sac at O’Neill Street.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
A new shared cycle and pedestrian bridge over President Avenue.
The new shared cycle and pedestrian bridge over President Avenue provides direct access between to Scarborough Park North and Bicentennial Park.
New shared cycle and pedestrian pathways connecting Bestic Street, Brighton-Le-Sands to Civic Avenue, Kogarah through the reinstated Rockdale Bicentennial Park. This supports healthier communities and provides safe and direct routes to local centres, schools and other destinations.
Shared cycle and pedestrian pathways from Bestic Street, Brighton-Le-Sands south to Civic Avenue, Kogarah through the reinstated Rockdale Bicentennial Park. This supports healthier communities and provides safe and direct routes to local centres, schools and other destinations.
The Motorway Operations Centre will operate 24 hours a day, seven days a week to monitor and operate the tunnel.
This Motorways Operations Complex consists of the West Botany Street Ventilation facility, substations and power supply for the tunnels, car parking and a disaster recovery site.
The southern West Botany Street ventilation outlet will be constructed in the industrial zone on West Botany Street, and the design will take into account its surrounding environment.
Elevated ventilation outlets are very effective at ejecting tunnel air high into the atmosphere through a combination of buoyancy and speed.
Once in the atmosphere, the ejected tunnel air dilutes hundreds of times as it mixes with the surrounding air and becomes indistinguishable from background levels.
Air quality will be continuously monitored at the ventilation outlet to control the ventilation system. This ensures the strict limits outlined in the approval conditions are complied with at all times.
Once operating, air quality monitoring data will be publicly available on the new motorway website.
Placeholder – TBC Breakdown bays allow for safer pullovers and maintenance operations.
The tunnels will be built for three lanes but initially marked for two. They will include:
Placeholder – TBC Mainline tunnel stubs to connect to future stages of the F6 Extension.
Placeholder – TBC Cross passages allow for emergency and maintenance access between tunnels.
Drag the slider from the left to right to compare the existing corridor reserve to the designed road layout.
A new shared cycle and pedestrian bridge will be built over President Avenue.
Drag the slider from the left to right to compare the existing corridor reserve to the designed road layout.
Involves the widening of President Avenue and Princes Highway to provide additional turning lanes to increase capacity and improve traffic flow.
Drag the slider from the left to right to compare the existing corridor reserve to the designed road layout.
New signalised intersection at President Avenue to enter and exit the tunnels. Rockdale Bicentennial Park will be reinstated once the project is complete. The design of the reinstated park with be refined in consultation with Bayside Council, stakeholders and the community.
Drag the slider from the left to right to compare the existing corridor reserve to the designed road layout.
The new signalised intersection on President Avenue provides access in and out of the tunnels – providing direct connections to the Sydney motorway network.
Drag the slider from the left to right to compare the existing Ador Park layout to the new Ador Park layout.
Drag the slider from the left to right to compare the existing Bicentennial Park East layout to the proposed Bicentennial Park East layout.
Drag the slider from the left to right to compare the existing Bicentennial Park East layout to the proposed Bicentennial Park East layout.
Drag the slider from the left to right to compare the existing Brighton Memorial Playing Fields layout to the proposed Brighton Memorial Playing Fields layout.
Drag the slider from the left to right to compare the existing Brighton Memorial Park layout to the proposed Brighton Memorial Park layout.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Upgrade from three lanes southbound on Princes Highway with a shared straight/ left turn lane to four lanes to provide a dedicated, signalised, left turn from Princes Highway southbound onto President Avenue eastbound. This new left turn lane would be around 70 metres long.
Upgrade from a two lane to a three lane signalised right turn northbound from Princes Highway to President Avenue. It will be around 110 metres long and provide additional intersection capacity.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Monday to Friday 7am to 6pm
Saturdays 8am to 1pm
Tunnelling and spoil management will be carried out at this site 24 hours a day, seven days a week.
Spoil will be stored on site and removed during standard construction hours. Where we may need to remove spoil or take delivery of material that cannot be transported during standard construction hours, the community will be notified in advance.
Work will occur on this site for around four years.
Site is currently being used for the M8 motorway construction. Construction vehicles workers for the project will enter and exit the Arncliffe construction site directly from Marsh Street using the existing signalised intersection (left-in and right-in, left-out only).
Monday to Friday 7am to 6pm
Saturdays 8am to 1pm
Tunnelling and spoil management will be carried out at this site 24 hours a day, seven days a week.
Spoil will be stored on site and removed during standard construction hours. Where we may need to remove spoil or take delivery of material that cannot be transported during standard construction hours, the community will be notified in advance.
Work will occur on this site for around four years.
Construction vehicles workers will enter and exit the Rockdale construction site directly from West Botany Street. Temporary traffic signals will be installed to manage traffic flow so vehicles can enter and exit the site in all directions.
Construction at this site will be limited to standard construction hours, where feasible and reasonable:
Monday to Friday 7am to 6pm
Saturdays 8am to 1pm
Some work on may need to be carried out at night. The community will be notified in advance if this is required.
Work will occur on this site for around three years.
Construction vehicles can enter and exit the President Avenue construction site from President Avenue (left in/left out only).
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Monday to Friday 7am to 6pm
Saturdays 8am to 1pm
Work will occur on this site for around two years.
Monday to Friday 7am to 6pm
Saturdays 8am to 1pm
Work will occur on this site for around two years.
Monday to Friday 7am to 6pm
Saturdays 8am to 1pm
Some work will need to be carried out at night. The community will be notified in advance.
Work will occur on this site for around three years.
Truck movements and haulage routes will be restricted to main roads, including access to and from construction sites, to avoid local or residential street and for the safety of pedestrians and road users.
Truck movements and haulage routes will be restricted to main roads, including access to and from construction sites, to avoid local or residential street and for the safety of pedestrians and road users.
Truck movements and haulage routes will be restricted to main roads, including access to and from construction sites, to avoid local or residential street and for the safety of pedestrians and road users.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
New service utilities include a permanent power supply line from Canterbury substation.
A new eastbound channelised (separate) right in and right out
Installing traffic lights at Lachal Avenue to provide a right hand turn from President Avenue and maintaining the existing parking spaces on Lachal Avenue.
Left-in and right-in only (no turn out) on Lachal Avenue due to switching traffic directions in Traynor Avenue and Lachal Avenue.
Left-out only (no turn in) on Traynor Avenue due to switching traffic directions in Traynor Avenue and Lachal Avenue.
The project is proposing to remove the westbound right movement onto President Avenue.
No changes to access proposed
Moorefield Avenue remaining open as a left in, left out intersection.
Extended right turning lane from President Ave into West Botany Street.
Installing an additional left hand turn lane at the intersection on West Botany Street.
Installing traffic lights and removing a small amount of parking at Civic Avenue to improve access and safety.
The project is proposing to reconfigure O’Neill Street to a cul-de-sac restricting vehicle access to/from President AvenueExisting.
The project is proposed to extend the right turn lane from President Avenue onto O’Connell Street.
No changes to access proposed
The new shared pedestrian and cyclist pathway has been extended south ending in Chuter Avenue, Monterey.
Recognising the impact on recreational and sporting facilities within Bicentennial Park during construction, we will be providing new and upgraded facilities to compensate for this loss of recreational and open space.
Roads and Maritime is proposing to relocate the existing playground in the Ador Park/McCarthy Park Precinct. The final location will be determined in consultation with local Council and the Stakeholder Liaison Group, as well as input from the local community.
Note: This proposal is not detailed in the EIS and will be subject to separate planning approvals. We will continue to engage with Bayside Council, the Stakeholder Liaison Group and local community to refine this proposal.
The tunnel has been located to avoid the Kings Wetland.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Placeholder – TBC Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
The bridge will be reinstated with a new viewing deck.
The propose upgrade to the Memorial Playing fields during construction will be developed in consultation with all stakeholders including the school, as we understand it is important to maintain the schools current use of this recreation space. The design proposes:
Note: This proposal is not detailed in the EIS and will be subject to separate planning approvals. We will continue to engage with Bayside Council, the Stakeholder Liaison Group and local community to refine this proposal.
The Rockdale Wetlands will be revegetated.
The tunnel design and construction impacts avoid the Illinden Sports Centre
The reinstatement of Rockdale Bicentennial Park and the East Bicentennial Playing Fields will be finalised through consultation with Bayside Council, community and sporting groups, the Stakeholder Liaison Group and through community feedback.
We are proposing to reinstate the recreational facilities and playing fields with the potential to provide one full size grass field and smaller size grass fields.
Recognising the impact on recreational and sporting facilities within Bicentennial Park during construction, we will be providing new and upgraded facilities to compensate for this loss of recreational and open space.
Roads and Maritime is proposing to relocate the existing skate park in the Ador Park/McCarthy Park Precinct. The final location will be determined in consultation with local Council and the Stakeholder Liaison Group, as well as input from the local community.
Note: This proposal is not detailed in the EIS and will be subject to separate planning approvals. We will continue to engage with Bayside Council, the Stakeholder Liaison Group and local community to refine this proposal.
Consultation began in October 2017 with community engagement activities such as doorknocking, the distribution of community updates, pop up events at local shopping centres and briefings with key stakeholders, schools and government agencies. This feedback informed the environmental assessments on increased traffic and congestion, loss of property and green space, local air and water quality as well as noise and emissions from ventilation outlets. From June to August 2018 extensive consultation was carried out to support the release of more detailed project information and design and seek further community feedback.
Consultation for the project started in October 2017, following the NSW Government’s announcement to proceed with the M6 Stage 1.
Further consultation with the community and stakeholders was carried out between June and July 2018 when the new project and design information was released.
A Stakeholder Liaison Group was established, which includes Bayside Council and invited representatives from different user groups to meet to discuss construction impacts in the park and reinstatement and future uses once construction is complete. The first meeting was held late October.
Vehicles using tunnels reduces the number of vehicles on surface roads, improving air quality along The Grand Parade and General Holmes Drive by 0.2 to 2 microgram per cubic metre.
Vehicles using tunnels reduces the number of vehicles on surface roads, improving air quality along Marsh Street, Airport Drive and Princes Highway by 0.2 to 2 micrograms per cubic metre.
President Avenue and the tunnel portal entry will see a minor increase of 0.2 to 2 micrograms per cubic metre due to more vehicles using this road to enter the tunnel.
The emissions from the M6 Stage 1 tunnel will be dispersed high in the air from the ventilation tunnel on West Botany Street. By dispersing high into the atmosphere the result is no change to existing air quality parameters at or around the ventilation outlet site.
Under expected traffic conditions for the project, the predicted contribution of tunnel ventilation outlets to local air quality is negligible.
This is indicative of one construction site however there are multiple construction sites to support the construction of the project.
Construction noise mitigation measures include:
Select the topics you are interested in reading about